Welcome to Alasdair Macdonald Architects

Aviation

 


 

Credits

  • Project: Hangar for Department of Defence, RAAF Amberley Stage 2 - MRTT Project
  • Location: Amberley, QLD
  • Client: Leighton Contractors Queensland
  • Design & Contruct: Leighton Contractors Queensland

Hangar for Department of Defence, RAAF Amberley Stage 2 - MRTT Project

New hangar, workshop, stores and offices for a combination line and deeper level maintenance facility for the RAAF's new A330-200 air to air refuelling aircraft and the current fleet of C17 aircraft.

AMA provided the functional design brief for the docking and aircraft positioning in the Hangar. The brief was developed with key MRTT 33 squadron personnel to ensure the docking provided required access to the aircraft for maintenance requirements. AMA also reviewed the D&C Contract docking design at key stages for compliance with the brief, reviewed shop drawings and carried out site inspections for the duration and the completion of the project.

Back to Projects Page